Glossary entry

English term or phrase:

Peppermint test

Japanese translation:

はっか試験

Added to glossary by cinefil
Jul 6, 2008 03:16
15 yrs ago
1 viewer *
English term

Peppermint test

English to Japanese Tech/Engineering Construction / Civil Engineering 配管工事
The final test, with fixtures in place, can be made with either smoke or peppermint. To make the peppermint test, seal all traps with water and all openings with caps or plugs. All windows and doors should be closed tightly in order to aid in the detection of leaks. The system is partly filled through its highest point with a solution of hot water and oil of peppermint. The tester should avoid getting oil of peppermint on his hands or clothes.

To detect the leaks, he will have to be entirely free of its odor. After solution is added, the system is capped and allowed to stand for a short time. Then the tester goes over every joint, fixture connection, and trap. Wherever he detects the odor of peppermint, there is a leak. Note that the system needs to be only partially filled with the oil and hot water mixture as it vaporizes and so reaches all points.
http://www.plumbing-basics.com/water-supply/testing.htm
Proposed translations (Japanese)
2 はっか試験

Proposed translations

49 mins
Selected

はっか試験

イラストでわかる給排水衛生設備の技術
バックフローのはなし 28 ウォータハンマがひどい場合は、配管設備を破損させるよ! ... を構成している各部の通気管の名称 55 煙試験、はっか試験って何のテスト? ...
www.gakugei-pub.jp/mokuroku/book/457kyuhai/moku.htm 

一級建築士選択肢別徹底過去問演習〈暗記編〉 - Google Books Result
by 松井晃司 - 2001 - 840 pages
排水系統の試験は、水圧・満水・煙・はっか試験により行う。*各配管は、配管の一部または全配管完了後に、煙試験、はっか試験を行い、その後水圧試験、満水試験を行う ...
books.google.com.au/books?isbn=4835516257... 

ビル管検定
刺激性の濃煙のほかにハッカを使うこともあるのでハッカ試験ともいう. 問4.避雷針は電気設備技術基準ではなく建築基準法に基づく規定である。 ...
www.setsukan-eng.gr.jp/bilukankentei.htm 

Something went wrong...
4 KudoZ points awarded for this answer. Comment: "thanks a lot, Kathy-sama"
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search